I can post what I should be working on but am not, my baby is very complainy these past three days (teeth maybe?) and I have accomplished absolutely nothing. Right now she is complaining to dh so that I can read messages (haven't done it since Friday)
-I have started a pattern for gryphon and ammut for Kris, I have the felt cut and thread picked out, waiting to be sewn. Needs to be done this week.
-I have a really nice alpaca lace scarf I started in October and that I last touched mid November.
-Then there is a sweater I made for dh that has too tight and long sleeves, one sleeve is partially frogged and I have to reknit the rest of it, then repeat for sleeve number two.
-Then I have two bendie bodies wrapped, a customer asked really nicely whether I could make her a couple and I just couldn't say no even though I really don't like making bendies. This needs to be done this week.
-Then I have two bendie dolls to make for developing a pattern for Anubis and Thoth, I have the patterns drawn actually but I need the bodies and then I can cut out the heads and sew. This needs to be done this week too.
-Then I have made pipe cleaner body for a prototype of a troll that I am making for a swap.
-I have to sew dragons for a swap
-I have to make trees for a swap, actually today when we were on a public bus I managed to make half of one. These are crochet.
-And then I have a needle felted gnome body that needs a cloak and boots that needs to be done really soon, it is for k&f gnome event.
On the positive side, I finished a pair of longies I started in December (it didn't take me that long to knit, actually there are probably about 5 evenings of couple hours each, just got pushed aside for Christmas and stuff). I used curly-purly waist and I don't know whether my dd has gotten a slimmer waist since then or what but they don't stay up too well. But the longies look fabulous anyway, every day we get at least a couple of compliments

I just have to make a drawstring too and then they won't fall down.