skyblue
06-17-2004, 03:11 PM
We are
1)painting M bedroom (which has a new marmoleum floor)
2)painted the stairwell
3)painting the downstairs
4)going to paint the kitchen and upstairs bathroom (those two are unfortunately done in oil-based so repainting is more $$ and hard to find non-toxic, but I am researching!)
5)getting sisal on the stairs
6)going to get new facets for the leaky bathroom facets and possibly redo the downstairs bathroom counter (note you can only turn around in there so it is not that $ to redo).
And finally getting a large bookcase which we will be staining with safecoat stain.
We can't afford to buy more than our small place, so we are fixing up what we have to be allergy free and non-toxic.
1)painting M bedroom (which has a new marmoleum floor)
2)painted the stairwell
3)painting the downstairs
4)going to paint the kitchen and upstairs bathroom (those two are unfortunately done in oil-based so repainting is more $$ and hard to find non-toxic, but I am researching!)
5)getting sisal on the stairs
6)going to get new facets for the leaky bathroom facets and possibly redo the downstairs bathroom counter (note you can only turn around in there so it is not that $ to redo).
And finally getting a large bookcase which we will be staining with safecoat stain.
We can't afford to buy more than our small place, so we are fixing up what we have to be allergy free and non-toxic.